        Your location:Home >Scheme > Basketball court laying solution
        scheme

        Basketball court laying solution

        date posted:2016-12-01

        3


        Range of use:

        Indoor and outdoor tennis court, silicon PU volleyball court, silicon PU basketball court, badminton court and other venues.

        Construction scheme of cement based on silicon PU Stadium

        First, the basic treatment of cement

        A, ground grinding, clean up the ground.

        B, repair damage foundation.

        C, primer: basic enough after drying with special primer coating on the base surface, the principle to form a bright film after brushing the surface, lack of coating must be sufficient to date, (bottom coating effect to penetrate into the base of micro hole, after curing blockage and reinforcement of underground water and gas surface; bright film is formed ensure the foundation of micro holes completely blocked), should be avoided in the sun or the foundation of high temperature circumstance (>450C) construction to ensure the bottom paint permeability (no fog rain weather in the morning or evening suitable). Based on the surface strength of <C20 or surface loose, available primer and 1 times diluted mixture is coated on the surface of thick (enhanced permeability, increase the depth of penetration) formed bright film surface until now, the surface of the base to meet construction requirements.

        D, filling: coating after curing, the direct use of elastic material to fill the joints with portable grinder polished, and elastic material in two or more of the "V" type slot fill (a fill thickness of not more than 1.0mm thick foam, affect the performance of the sealant). (as shown in figure (2))

        E, leveling, repair: local water circle in the pickling process, water with not more than 5mm with elastic layer and surface layer of special sand according to 1:1 (weight ratio), plus the amount of diluent mixing and adjusted to suitable for the construction of consistency, using a ruler or scraper scraping leveling water; if the water depth more than 5mm, the application of elastic material in the thin coating of stagnant water, and then the elastic material with 40~80 mesh sand according to 1:6~8 (weight ratio) mixing evenly, smooth water in paving and compaction, thin coating (elastic material function to ensure the bonding repair material and base firmly; if the sand grain is fine with >80 eyes. The amount should be reduced accordingly) repair attention when trimming don't let the repaired side higher base, if there are higher in after curing, polishing, elastic layer construction can be carried out.

        Foundation treatment:

        A, to eradicate the original asphalt base.

        B, re paving cement mixed soil.

        C, water leveling repair: according to the new requirements of cement based processing.

        Two, silicon PU material construction

        Here, a basic surface cleaning:

        1, clean and with water wet surface, and then coated with dilute hydrochloric acid is about 5% and scrub;

        2, clean the dust high pressure field.

        Here, two base expansion joints and cracks:

        1, the expansion joint and the crack mouth construction into V type (an inverted horn shape);

        2, thoroughly clean the inside and remove the slot wall sediments, dirt, grease etc..

        Here, three basic waterproof primer Construction: more than 0.2KG/m2

        Waterproof primer for single component materials, with a roll coating method directly based on the dry cement penetration after construction; theory of material dosage of 0.2kg/m2, according to the rough degree of cement base surface, the amount of material will change. Shall be fully covered (including expansion joints and cracks in the wall), adhesive curing shall be 24 hours, 24 hours after the next process of construction.

        Here, four foundation joints, cracks and low-lying water repair:

        1, after strictly regulate the treatment based on expansion joints, cracks qualified, using silicon elastomer buffer material PU course according to the weight ratio of adding 5% purified water directly after high speed stirring to fill a flat.

        2, repair the site water, can use D68 emulsion product scraping and coating repair level.

        Here, five principal elastic construction: more than or equal to 6KG/m2, three layer construction

        The construction of the elastic layer: before construction according to the weight ratio of 1-3% (according to the construction of environmental temperature and humidity adjustment) add water purifying high speed stirring and instant fast construction; the construction of a smooth toothed trowel.

        Construction: six, wear resistant finish surface layer: more than 0.2KG/m2, the construction of roller coating or coating layer not less than two

        Silicon PU water-based paint is a two-component materials, must be in the correct proportion of provisions in the construction (topcoat: crosslinking agent =14:1, and the ratio of no uneven stirring performance will reduce the use of surface layer and the bottom adhesion) two components are fully and quickly use the instant high speed stirring. The construction method is limited to the way of rolling and coating or spraying, and the roller is used to change the direction of roller. Finish the construction temperature is lower than 5 DEG C is not suitable for construction, 10 hours after the construction of anhydrous immersion.

        Case seven and site 72 hours after the completion of cleaning, maintenance can be put into use.

        This guide only for the use of silicon PU materials to provide guidance in the nature of the site construction of some of the details of the site should be properly handled according to the situation.

        Key words:Basketball court laying solution
        分享到:
        Previous:Swimming pool construction Next:No Next
        主站蜘蛛池模板: 在线观看二区三区午夜| 日本一区二区三本视频在线观看 | 亚洲成a人片在线网站| 伊人久久大香线蕉亚洲五月天| 日韩精品一区二区av| 小蝌蚪视频一起射| 亚洲综合精品第一页| 99中文在线精品 | 亚洲Va中文字幕久久无码一区| 国产精品00校花H视频| 黑人AV网站| 91亚洲国产三上悠亚在线播放| 成本人h无码播放私人影院| 亚洲高清av一区二区三区| japanese久久中文字幕| 国产精品久久久久网站| 国产日韩欧美一区二区三区乱码| 欧美狠狠鲁| a级福利毛片| 国产av日韩av| 人妻偷拍一区二区三区| 色国产视频| 麻豆成人久久精品二区三区免费| 玩弄人妻少妇500系列| 中文字幕无码日韩欧毛| 亚洲另类无码专区丝袜| 无码伊人久久大杳蕉中文无码| 好爽~又到高潮了毛片视频 | 精品国偷自产在线视频99| 国产精品免费看香蕉| 日韩有码中文在线观看| 久久综合久久 黄色大片| 亚洲日产无码中文字幕| 3P在线| 奇米AV| 中日韩亚洲人成无码网站| 麻豆蜜桃伦理一区二区三区| 西西人体大胆午夜视频| 污视频免费观看网站| 日本高清中文字幕免费一区二区 | 在线精品国产成人综合|